  1. 230.95 (C) Performance Testing. The ground-fault protection system shall be performance tested when first installed on site. This testing shall be conducted by a qualified person (s) using a test process of primary current injection, in accordance with instructions that shall be provided with the equipment.
    www.electricallicenserenewal.com/Electrical-Conti…
    In the 2017 NEC, in section 230.95(C), “primary injection testing” was mandated and a copy of the test is required to be provided to the electrical inspector. The objective of the test is to identify how the system operates under various levels of current load.
    www.dli.mn.gov/sites/default/files/pdf/eli_bulletin_i…
    The National Electric Code under Article 230-95-C requires that any ground-fault protection system be performance tested when first installed. The 2017 NEC requires the test process to be primary current injection for ground fault testing.
    www.eaton.com/content/dam/eaton/products/elect…
    NEC® Section 230.95 — Ground Fault Protection of Equipment This Section means that 480Y/277V, solidly grounded “wye” only connected service disconnects, 1000A and larger, must have ground fault protection in addition to conventional overcurrent protection.
    www.eaton.com/content/dam/eaton/products/elect…
     
  2. 230.95(C) Performance Testing.

    Learn how to test GFPE (ground-fault protection of equipment) devices according to the 2017 NEC code change. See the code language, a preview of Article 230, and a quiz question on this topic.

     
  3. NEC 230.95: Ground Fault Protection for Services Over …

    Learn what Ground Fault Protection (GFP) is and when it is required by the National Electrical Code (NEC) for service disconnects over 1,000 amps. Find out the exceptions, limitations and benefits of GFP systems for electrical safety …

  4. Performance Testing Basics - TestGuy Electrical Testing Network

  5. Performance Testing of Ground-Fault Protective …

    Apr 1, 2010 · One of the most important aspects of a safe electrical power system is the proper performance of ground-fault protective equipment. Mandated by the National Electrical Code (NEC), Art. 230.95(C) states, “The …

  6. OESC 230.95(C) Performance Testing.

    OESC 230.95 (C) Performance Testing. In the NEC ®, Section 230.95 requires ground-fault protection (GFP) of equipment for solidly grounded wye electric services of more than 150 volts to ground but not exceeding 1000 volts phase …

  7. NEC Article 230: Services (Sections 230.1 to 230.95)

  8. NC AMENDMENT 230.95(C)

    When GFPE is installed, section 230.95 (C) requires specific performance testing to make sure the device is functioning as intended. Before the 2017 NEC®, the testing was only required to be done in accordance with the manufacturer’s …